How to apply microcement.
Four steps, four to seven days between the primer and first use. Read the full method below or download our PDF after ordering.
- 01
Prepare the substrate
Clean and degrease tiles, plaster or concrete. Repair any cracks. Lightly sand glossy surfaces. Apply our bonding primer and leave to dry for 4 hours.
- 02
Apply Microbase (2 coats)
Apply the first coat of Microbase with a trowel, embedding the fibreglass mesh. Leave to dry for 12 hours, then sand. Apply the second coat of Microbase. Sand again.
- 03
Apply Microfinishing or Microtraffic (2 coats)
Apply the chosen finish in a thin layer with a stainless-steel trowel. Allow 6 to 12 hours of recoat time between coats. Sand lightly between each coat.
- 04
Varnish
Apply the first coat of two-component polyurethane protective varnish. Wait 4 hours. Apply the second coat of varnish. Leave to dry for 24 hours before light use, and 7 days before heavy traffic or contact with water.